SeamlessDocs


FLOODPLAIN DEVELOPMENT PERMIT (FDP)

Directions/Guidance (D/G)

  1. The Property Owner (PO) is the Applicant; however, upon their approval, an Authorized Representative (AR) working for/reporting to them may handle the FDP process. EDiv will speak to the Owner before issuing FDP.
  2. Applicant is responsible for providing information in boxed area on Page 1 (except where identified as “Staff use only”), understanding remaining information as explained, as well as completing requirements of FDP; EDiv Reviewer will review provided information, request any clarification, and complete the remainder of the FDP. Please provide EDiv with ORIGINALLY signed PDF.
  3. Any available design plans need to be provided to aid in review; EDiv may require an appropriate set of plans for the files.
  4. Initial/Conditional and Final FDP Reviews can, in general, be completed within 72-hours after submittal, based on staff availability.
  5. Madison County Tax Assessor’s determined values can be obtained in person from their office in the Courthouse (100 North Side Square Hsv., AL 35801; 256-532-3350) or via the following two websites http://www.emapsplus.com and http://www.deltacomputersystems.com/AL/AL47/pappraisala.html.
  6. A professional appraisal of the Property (in the case of damage, prior to such occurrence) with an appropriate cover letter (example available) breaking out the value of the Structure alone may be required and is almost always beneficial to the Owner regarding future work limitations. Generally, an appraisal needs to have been completed with 6 months damage/loss or FDP request.
  7. Complete cost estimate with cover letter (example available) signed by appropriate parties may be required for Conditional Approval.
  8. It is in the best interest of all that the appropriate party on the Owner’s side of the process confirms from the start of and during the PW that required elevations are being met.
  9. Vent Openings are outlined in FEMA Technical Bulletin 1/August 2008. Flood vents located below the BFE+1’ must be permanently open (or automatically opening to the presence of flood waters), located on at least two sides of the foundation/enclosure walls, and the bottom of the Vent Openings must be no higher than one foot from adjacent grade on either the interior or exterior of the wall. Should screen covers be placed over the vent, it will decrease the allowable area of the vent. Screening over the vent must be lightly tacked on the inside and easily knocked out under flood water conditions.
  10. If for any reason elevations do not comply as required/specified in the FDP, any alterations necessary for compliance and subsequent certifications will be at the expense of the Property Owner.
  11. Upon Final Review, and (presumed) Approval, the original FDP will be completed by the EDiv (copies of documentation will be provided if requested); EDiv will retain original FDP and required documentation.
  12. All local/on-site benchmarks should be left on-site at least until Final Approval.
  13. Non-Residential structures opting for floodproofing to the BFE+1’ required elevation: A professional/registered engineer or architect can certify floodproofing with appropriate design plans, visual inspections, and FEMA Form 086-0-34 (7/12) “Floodproofing Certificate”.
  14. This FDP in no way relieves the Applicant from obtaining other required governmental permits.
  15. Additional requirements may apply, including those found in the City Zoning Ordinance and Stormwater Management Manual.
  16. Additional information can be found through the following City, FEMA, and Alabama Emergency Management Agency web sites http://www.huntsvilleal.gov, www.fema.gov, and www.ema.alabama.gov, respectively.
Please check that you agree before continuing.
By continuing I agree that I am willing to complete a digital version of the document(s) and that information about my user session will be stored.
InitialApproval
03/28/2026
I.N.Will Update Upon Signing
FinalApproval
03/28/2026
I.N.Will Update Upon Signing
Signature HereClick to Sign
03/28/2026Click to Sign
Prime Contractor
Proposed Work Description
Check Box22
Check Box23
Yes complete financial info below Staff Use Only
NA
No skip to Attendant Utilities description
Check Box4
Check Box24
Check Box25
Check Box26
Check Box27
Check Box28
Check Box29
Check Box30
Check Box31
Check Box32
Check Box33
Check Box34
Check Box35
Check Box36
No
Yes If yes then reference Project Number
Check Box37
Check Box38
Check Box1
Check Box2
Check Box3
Property Located in Zones
AE
Option A at least two openings on different exterior walls providing a minimum
2 Original Finished Construction Elevation Certificate EC most current FEMA Form 86033 additionally needs to
6 Schedule Final Inspection to confirm
Applicable Structure or
A
Xshaded
X if applicable
Floodway
1 Venting EA below BFE1
Option B engineereddesigned venting certified by an AL professionally licensedregistered engineer or architect as
3 Similar to R2 include for
4 Cover Letter w financial backup ie receipts invoices etc attached reference attached guidance example
5 Leave all PropertyLot corner pinsmarkers in place at least until after mandatory Final Inspection Reference R6
7 Original signed stamped Letter from a Professional EngineerLicensed Surveyor stating that no fill was placed in the
8 Call or email EDiv POC to release Flood Fringe Hold when permitted work is complete
9 Original signed stamped AsBuilt drawing by a Professionally Licensed Surveyor showing the structure or objects
Floodway_2
1 Annual Chance Floodplain
10 Appropriate
Letter of Map Change LOMC specifically LOM
NoRise Certification or
Floodproofing Certificate
1 Per provided plansavailable GIS data the PWstructure will not beis not in the 1 Annual Chance Floodplain
x

Additional Signatures Required